Wednesday, June 24, 2015

Assignments for Summer Term Students (Foundation Engg.)

The below students are informed to submit 4 assignments for the above subject to Ms. Sarmistha Rudra Paul at Room No. 202 set 2 for CA marks for this summer term. The last date of submission is 02 July 2015. No soft copy will be accepted.

Sl
Roll No.
Name of Student
Suject Code
Subject Name

1
100107049
BHARAT SINGH NAGAR
cvl302
FOUNDATION ENGINEERING
SUMMER-3
2
110107122
NIKHIL CHAUHAN
cvl302
FOUNDATION ENGINEERING
SUMMER-3
3
090107155
VIPUL VERMA
cvl302
FOUNDATION ENGINEERING
SUMMER-3


Go to the link for the Assignments



Tuesday, June 23, 2015

ASSIGNMENTS OF FM ,EE-1 & BASIC OF SURVEYING FOR SUMMER TERM STUDENTS

Notice: Assignments for CA Marks in Quantity Surveying

Notice: Assignments for CA Marks in Quantity Surveying
It is to inform the below student to submit the below assignments for assigning your CA marks for this summer term. The last date of submission these 04 assignments is 03 July 2015. Please submit these assignments to Ms Sarmistha Rudra Paul, Assistant Professor, Dept. of Civil Engineering, Sharda University. No soft copy will be accepted. You have to submit these assignments in hard copy.
P. Mukherjee

Roll No.
Enr. No.
Name of Student
Course
Branch
Paper
ID
Subject
Code
Subject
Name

110107162
11SETCIVL297
SAHAR RAZA
B. Tech.
CE
0911
OEL 011
QUANTITY SURVEYING
SUMMER-4
110107196
11setcivl271
SONU KUMAR
B. Tech.
CE
0911
OEL 011
QUANTITY SURVEYING
SUMMER-4

Note- if required ,Assume data suitably 
ASSIGNMENT -1
1.    What are the different methods of estimation? Explain [a] detail of measurement form and [b] Abstract of estimated cost form.
2.    Explain briefly any ten items of estimation of building with its units.
3.    Briefly explain need for estimation? Explain its salient features.
ASSIGNMENT -2
1.   List the factors to be considered while preparing detailed estimate and explain briefly?
              2.  The internal dimensions of a single roomed building are 5.75 x 3.75m. Find the Centre line length              of room and parapet. If the wall thickness of room and parapet are 300mm and 250mm respectively.
       3.   List the difference between centre line method and long wall-short wall method of taking out measurements.

ASSIGNMENT -3
1.    Why total center line length for different item of building estimation is changing? Explain the reason with diagram.
2.      Define the following terms [a] reducing calculation [b] degree of accuracy in estimating
ASSIGNMENT -4
  1. 1.      Prepare an approximate estimate of building project with total plinth area of all building is 800 sqm. and from following data. Determine the total cost of building project.

i)          Plinth area rate Rs. 4500 per sqm
ii)         Cost of water supply @7½%of cost of building.
iii)        Cost of Sanitary and Electrical installations each @ 7½% of cost of building.
iv)        Cost of architectural features @1% of building cost.
v)         Cost of roads and lawns @5% of building cost.
vi)        Cost of P.S. and contingencies @4% of building cost.
        

2.         The plinth area of an apartment is 500 sqm. Determine the total cost of building from the following data:
a) Rate of construction = Rs.1230/--per m3.
b) The height of apartment = 16.25 m
c) Water Supply, Sanitary and Electrical installations each at 6% of building cost.
d) Architectural appearance @ 1% of building cost.
e) Unforeseen item @2% of Building cost.
         f) P.S. and contingencies @4% of building.
            
























assignment (irrigation)

ENGINEERING DYNAMICS ASSIGNMENT ........................................................Mohd Asif



 Find  ENGINEERING  DYNAMICS ASSIGNMENT in the link below:
https://drive.google.com/file/d/0Bwy1ZhlP9e41OUdZcUpObzB1eGs/view?usp=sharing

'DESIGN OF PRESTRESSED CONCRETE'..............................................Wasim Akram

Find   ''DESIGN OF PRESTRESSED CONCRETE'' ASSIGNMENT  in the link  below:


https://drive.google.com/file/d/0Bwy1ZhlP9e41M1R4TjdsTzJkbm8/view?usp=sharing

SOIL MECHANICS ASSIGNMENT.........................................................Wasim Akram


find  SOIL MECHANICS  ASSIGNMENT in the link below:
https://drive.google.com/file/d/0Bwy1ZhlP9e41MmVrUHRmaldPWGM/view?usp=sharing

'MECHANICS OF DEFORMABLE SOLIDS' Assignment ......................................................Wasim Akram



Find  'MECHANICS OF  DEFORMABLE  SOLIDS'  Assignment  in the link below:

https://drive.google.com/file/d/0Bwy1ZhlP9e41ejRPWkxIdTh0Rkk/view?usp=sharing

Design of Steel structure ....................by M.Asif

Environmental Engineering -2 ...............by M.Asif

OPEN-CHANNEL FLOW Assignment..............................Sahzada Aman

find in the link below the assignment of OPEN-CHANNEL FLOW:
https://drive.google.com/file/d/0Bwy1ZhlP9e41eGtYeFpxT0E2UTA/view?usp=sharing

STRUCTURAL ANALYSIS ASSIGNMENT......................................Sahzada Aman


Find STRUCTURAL  ANALYSIS ASSIGNMENT  in the link below:-

 https://drive.google.com/file/d/0Bwy1ZhlP9e41UWFPbkxmdy1LUlk/view?usp=sharing

FLUVIAL HYDRAULICS ASSIGNMENT.......................................Sahzada Aman

                                   
                            FLUVIAL HYDRAULICS – ASSIGNMENT
   
   
               1.Explain different types of sediment load with suitable examples
        2.Define terminal velocity and derive a relation for the same.
          3.Explain different bed forms formed during sediment motion.
                 4.Explain Shield’s theory of sediment motion in fluvial hydraulics.
                           5.Explain various complexities in analysis of mobile boundary channels.

SUMMER TERM - ADVANCED SURVEY ASSIGNMENT

Submission date 3rd July 2015. No late submission allowed.

https://drive.google.com/file/d/0Bwy1ZhlP9e41bFltMzhhMjZKSVk/view?usp=sharing

Nishant Rajoria

Monday, June 22, 2015

ADVANCED RCC NOTES

ASSIGNMENTS - CONCRETE STRUCTURES AND ADVANCED RCC

Please find assignments of concrete structures and advanced rcc. Submission date is 3rd July 2015. No late submissions allowed.

https://drive.google.com/file/d/0Bwy1ZhlP9e41OUpOekdFdGlXaGc/view?usp=sharing

https://drive.google.com/file/d/0Bwy1ZhlP9e41aHZmSUtnYjFHTlE/view?usp=sharing

Nishant Rajoria


Notice for Continuous Assessment Marks in Summer Term 2015

Notice for Continuous Assessment Marks in Summer Term 2015
Dear student, the below list of faculty members [with mobile no] is assigned by the Civil Engineering Department for Continuous Assessment Marks in this Summer Term. You may contact or meet them in the department.
Prashant Mukherjee
Sub.Code
Subject Name
Term
Name of Faculty
Contact No.
CVL 001
Geoinformatic Engineering
V
Manakshi Mishra
8860581040
CVL 002
Transportation Engineering
V
Sarmitsha
9555619438
CVL 003
Advanced Surveying
VI
Nishant
9899616741
CVL 004
Environmental Engineering
VI
Shikha Saini
8860581040
CVL 005
Environmental Engineering-II
VII
Asif
9891636418
CVL 007
Transportation Engineering-II
VII
Sarmitsha
9555619438
CVL 013
Design of Pre-Stressed Concrete
VIII
Wasim Akram
8800818834
CVL 015
Irrigation Engineering
VIII
Manakshi Mishra
8860581040
CVL 051
Geoinformatics Lab
V
Prashant Kumar
9999221865
CVL 201
Basics of Surveying
III
Shikha Saini
8860581040
CVL 202
Hydrology
III
Manakshi Mishra
8860581040
CVL 203
Mechanics of Deformable Solids
III
Wasim Akram
8800818834
CVL 204
Structural Analysis
IV
Shazada Aman
9699616741
CVL 205
Soil Mechanics
IV
Wasim Akram
8800818834
CVL 301
Fluid Mechanics and Hydraulics
V
Shikha Saini
8860581040
CVL 302
Foundation Engineering
V
Sarmitsha
9555619438
CVL 303
Concrete Structures
V
Nishant
9899616741
CVL 304
Steel Structures
VI
Asif
9891636418
CVL 305
Open Channel Flow
VI
Shazada Aman
9699616741
CVL 401
Advanced RCC
VII
Nishant
9899616741
CVL 402
Fluvial Hydraulics
VII
Shazada Aman
9699616741
CVL 451
Design Lab
VII
Chhavi Gupta
8750005971
CVL 452
Fluvial Hydraulics Lab
VII
Prashant Kumar
9999221865
CVL 453
Technical Seminar
VII
J.D Prasad
9958573208
OEL 005
Engineering Dynamics
VI
Asif
9891636418
OEL 011
Quantity Surveying
VII/VIII
Sarmitsha
9555619438